The Missouri Highways and Transportation Commission has approved the 2020-2024 Statewide Transportation Improvement Program (STIP), which includes five projects in Daviess County.
The STIP is the Missouri Department of Transportation’s list of 1,872 highway and bridge projects that are planned by state and regional agencies. The draft STIP was released in June for public review and comment. It focuses on taking care of the state’s existing transportation system by annually investing in 1,014 lane miles of interstate pavements, 1,346 miles of major route pavements, 2,652 miles of minor route pavements and 213 bridges.
Missouri has the nation’s seventh largest state highway system with 33,859 miles of roadways and 10,385 bridges, but ranks 48th nationally in revenue per mile.
The STIP details an annual construction program that averages $924 million per year for the five-year period. But it is insufficient to meet the state’s unfunded high-priority transportation needs that are estimated in MoDOT’s “Citizen’s Guide to Transportation Funding” at an additional $825 million per year.
This STIP includes funding for the “Focus on Bridges” program that was initiated by Gov. Mike Parson and funded by the Missouri General Assembly approved budget with a one-time $50 million injection of general revenues for the rehabilitation and/or reconstruction of 45 bridges. The money that was previously dedicated to those bridge projects will be freed up for additional improvements to the state system of roads and bridges.
This STIP was developed assuming federal funding levels consistent with the FAST Act, which expires in September 2020. A forecast assuming a reduced level of federal funding, consistent with Highway Trust Fund revenues, was also prepared. MoDOT and planning partners worked together to identify specific projects that would be delayed, should federal funding be reduced.
“The STIP represents our commitment to Missourians of the projects that will be developed and delivered over the next five years,” MoDOT Director Patrick McKenna said. “However, this STIP recognizes the serious consequences to our plans if policy makers in Washington are unable to fix the Highway Trust Fund. In Missouri, that puts $613 million of projects, including 5,423 lane-miles of roadway improvements and 55 bridge projects, in jeopardy in FY 2021 and 2022. We have worked with our planning partners to determine these at-risk projects and offer a qualified commitment of project delivery.”
The draft STIP also includes detailed project information for non-highway modes of transportation and a section detailing planned operations and maintenance activities for the next three years. This additional information is provided to allow Missourians to more easily see how their transportation funding is invested.
The STIP lists transportation projects for fiscal years 2020 through 2024 (July 1, 2019 through June 30, 2024).


This website brought to you in part by the following sponsor:

 
 
Find out how to advertise here - Email us! [email protected]
 

Dollars are in thousands. MoDOT combines US. 69 and Hwy. 6 in several locations for mapping purposes.

2020-2024 STIP projects in Daviess County include:

Route IS 35

Pavement resurfacing from Rte. 69 to Clinton County line near Cameron.

Length: 14.94 miles

Funding Category: Taking Care of System/Rehab & Reconst.

Share of Cost: AC-State: 8,084; State: 898; Local: 0

Award Date: 2022

Anticipated Estimate Total: 8,992 (Engineering: 10 prior, 31 in 2019-20, 154 in 2020-21 and 649 in 2021-22; Construction: 8,148)

Route US 69/Hwy. 6

Pavement preservation treatment from I-35 to 4th Street in Trenton

Length: 34.90 miles

Funding Category: Taking Care of System/Preventive Maint.

Share of Cost: Fed: 2,083; State: 521; Local: 0

Award Date: Spring 2020

Estimate Total: 2,657 (Engineering: 53 prior and 181 in 2019-20; Construction: 2,423)

Route US 69/Hwy. 6

Shoulder repair from I-35 to Trenton city limits.

Length: 34.90 mile

Funding Category: Taking Care of System/Rehab & Reconst.

Share of Cost: AC-State: 432; State: 108; Local: 0

Award Date: Summer 2019

Estimate Total: 550 (Engineering: 10 prior and 40 in 2019-2020; Construction: 500)

Route KK

Bridge painting on various bridges in Daviess, Sullivan and Clinton Counties. Project involves bridges A1801, A1807, A1809, A1917, NO366, PO528, and A1152.

Length: .59 miles

Funding Category: Taking Care of System/Preventive Maint.

Share of Cost: Fed.: 1,044; State: 261; Local: 0

Award Date: 2021

Anticipated Estimate Total: 1,358 (Engineering: 53 prior; 13 in 2019-2020 and 90 in 2020-2021; Construction: 1,202)

Route Z

Bridge rehabilitation over Sampson Creek, 1.1 miles east of Rte. AA near Pattonsburg. Project involves bridge A0876.

Length: 0.03

Funding Category: Taking Care of System/Rehab and Reconst.

Share of Cost: Fed. 400; State: 100; Local: 0

Award Date: Summer 2022

Anticipated Estimate Total: 504 (Engineering: 4 prior; 4 in 2019-20; 12 in 2020-21; and 34 in 2021-2022; Construction: 450)