General highway maintenance and construction
Apr 26, 2016 | Community News |
- The following is a listing of general highway maintenance and construction work in Daviess County planned for the week of April 25 – May 1 from the Missouri Department of Transportation. In addition to the work listed below, there may be pothole patching, bridge deck washing, striping, brush cutting, guardrail repairs and other road work conducted throughout the region. Many of these will be moving operations and could include lane closures with delays. Route FF – CLOSED from County Road 230 to County Road 240; pothole patching, April 25, 7:30 a.m. to 3:30 p.m.
- Route K – CLOSED from 400th Street to Route B; pothole patching, April 25 – 26, 8 a.m. to 3 p.m. daily
- Route B – CLOSED from Route 190 to Route K; pothole patching, April 27 – 28, 8 a.m. to 3 p.m. daily
- Route 190 – From the Livingston County line to Route V; drainage work, April 28 – 29
- Route UU – CLOSED from Route B to Route P; pothole patching, April 29, 8 a.m. to 3 p.m.